Cloud LM-2 Series Manual de instalación Pagina 12

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 36
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 11
INSTALLATION INSTRUCTIONS
LM2 Control PCB
Black
Yel/White
Green
Red
Pentair IntelliTouch:
Communication Terminal Block
Securing the Communications Wiring
Fit the communication wire into the slot beside the output cable cord grip and secure the
communication wire to the Cell Output cable with cable ties as shown below.
6. Initial start-up
After waiting 24 hours to allow the PVC glue on the cell fittings to fully set, and making sure that all
the salt has dissolved in the pool water, switch on the pump and chlorinator.
Add salt if necessary. Do not operate the Clearwater until the salt has dissolved as this will cause
damage to the unit.
Black = OV
Yel/White = Signal+ (A)
Green = Signal- (B)
Red = V+
12
Vista de pagina 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 35 36

Comentarios a estos manuales

Sin comentarios